At the Casino Rama warehouse, our team removed the deteriorated caulking from the vertical stucco control joints, replaced the existing backer rod and applied new commercial-grade silicone throughout. The sealant was carefully colour-matched to the stucco for a clean, seamless and weather-resistant finish.


